Henley Halebrown Architects logo

architects Henley Halebrown

  • Works
  • Journal
  • Studio
  • Contact
  • All
  • News
  • Press
  • Essays
  • Events
  • On-site
  • Dialogues
  • Podcasts
Arnold Road Site Visit

February 2025
Site visit to Arnold Road →

9_1907_Site_visit_office_240322_3

March 2024
Site visit to Barge House →

9_1106_Castle Lane_Site_240228_5129

March 2024
Castle Lane continues apace on site →

3000_9_1907_Site_240222_5024

February 2024
Staircase being installed at Barge House →

9_1907_photo_Site_JP_240206_4839

February 2024
Precast concrete for Barge House being inspected at factory →

3000_9_1907_Site_Glulam_Nov23_2007

December 2023
Timber beams on top floor of Barge House being installed →

3000_9_1106_Castle_Lane_Site_230928

September 2023
Castle Lane rooftop structure being installed →

9_1907_Barge_site-photo_230623_2

July 2023
Barge House is now on site in Southwark →

1907_Barge_at_ceramics_factory

May 2023
Factory visit in Germany →

3000_IG_1106_220624

June 2022
Our Castle Lane project has now started on site →

9_1807_Site_HHbR_9738_220524

May 2022
Stour Road is on site →

9_1901_Site_photos_JP_3.jpg

October 2021
Oriel windows going in at the former Ace Hotel →

3000_9_1806_De Beauvoir_site_210723

July 2021
Timber detail at 100 De Beauvoir Road →

3000_IG_1806_210601-1.jpg

May 2021
100 De Beauvoir Road under construction →

20210520_B

May 2021
The Laszlo under construction →

3000_IG_1805_210217-2

April 2021
Setting out on Site of The Laszlo →

3000_IG_1806_210210-1.jpg

February 2021
Roof being constructed at 100 De Beauvoir Road →

3000_IG_1806_201126-Site-1

November 2020
100 De Beauvoir Road timber roof construction →

HNPS Topping 4

December 2018
Hackney New Primary School Topping Out →

180820-stair

August 2018
Concrete Stair Core →

180613-colonnade.jpg

June 2018
Mirrored Plan →

180606-Site1.jpg

June 2018
Precast Revealed →

1102_photo-06.jpg

May 2018
De Beauvoir Block Construction Time-lapse →

180511-Site-1.jpg

May 2018
Concrete Frame →

180412-Amber-1.jpg

April 2018
Amber Precast Production →

IMG_2120.jpg

February 2018
Groundwork and Frame →

DSC03727.jpg

February 2018
Precast Concrete →

HNPS-171011-01.JPG

October 2017
Demolition →

Follow us on Instagram
Follow us on Instagram Follow us on LinkedIn Follow us on Facebook

21 Perseverance Works
38 Kingsland Road
London E2 8DD

T: +44 (0)207 033 9700
studio@hhbr.co.uk