Castle Lane starts on site
June 2022
Our Castle Lane project has now started on site.
The adaptive reuse of four period blocks will create 88 affordable homes, which will be operated by Notting Hill Genesis, as well as one private dwelling open for market sale.
The design works with the buildings' loadbearing internal walls to achieve the required mix with minimal structural alteration.