1 /
  • 3000_9_1907_Site_Glulam_Nov23_2007
  • 3000_9_1907_Site_Glulam_Nov23_1988
  • 3000_9_1907_Site_Glulam_Nov23_1980
  • 3000_9_1907_Site_Glulam_Nov23_1997

Timber beams on top floor of Barge House being installed

December 2023

The timber beams that form the top floor of Barge House are now being installed on site in Southwark.